Electric
National Grid - Docket No. 4116 - Order No. 19894 rejecting the Stipulation and Settlement regarding National Grid's Energy Efficiency Program Plan and associated budget for 2010. Written Order issued 2/3/10.
Review Into the Adequacy of Renewable Energy Supplies Pursuant to R.I.G.L. 39-26-6 - Docket No.4050 - Order No. 19893 determining that there is potential adequacy of renewable energy supplies to meet the increase in the percentage requirement of energy from renewable energy resources to go into effect in 2011. Written Order issued 1/29/10.
Rules and Regulations Governing a Long-Term Contracting Standard for Renewable Energy - Docket No. 4069 - PUC issues Report Order No. 19892 summarizing comments and rationale for adoption of new rules. Report issued 1/29/10.
Pascoag Utility District - Docket No. 4137 - Order No. 19889 approving Pascoag's amended street lighting tariff. Written Order issued 1/25/10.
Pascoag Utility District - Order No. 19883 approving Pascoag's Standard Offer Charge of $0.07655 per kWh, Transmission Charge of $0.02008 per kWh, and Transition Charge of $$0.01158 per kWh effective January 1, 2010. Also, approving Pascoag's Supply Procurement Plan. Written Order issued 12/23/09.
Pascoag Utility District - Docket 4130 - Order No. 19882 approving Pascoag's 2010 Demand Side Management Programs and associated budget. Written Order issued 12/23/09.
Pascoag Utility District - Docket 3569 - Order No. 19881 granting Pascoag's request to extend the waiver from Credit Card Regulations until July 1, 2010. Written Order issued 12/23/09.
National Grid - Docket No. 4111 - Order No. 19871 approving Second Revised Procedural Schedule in connection with the Company's Proposed Town of New Shoreham Project - Written Order issued 12/23/09.
National Grid - Docket No. D-09-49 - Report and Order No. 19847 approving a Settlement Agreement executed between National Grid and the Division of Public Utilities regarding the company's proposed issuance and/or sale of long-term debt. Written Order issued 12/9/09.
National Grid - Docket No. 4041 - Order No. 19880 approving National Grid's November 19, 2009 compliance filing regarding 2010 SOS Procurement Plan for Large C&I Group and approving SOS rates for Large Customer Group for period January - March 2010. Written Order issued 12/23/09.
National Grid - Docket 4041 - Order No. 19878 approving a Renewable Energy Supply Charge of $0.00123 per kWh effective March 1, 2010. Written Order issued 12/23/09.
National Grid - Docket No. 4041 - Report and Order No. 19839 approving National Grid's 2010 RES Procurement Plan, 2010 SOS Procurment Plan for Large C&I Group, and 2010 SOS Procurement Plan for Small Customer Group and furhter modification to the plan. Written Order issued 11/24/09. Errata Order No. 19846 issued 12/7/09.
National Grid - Docket No. 4079 - Report and Order No. 19821 approving National Grid's amended Qualifying Facilities Power Purchase Rate, R.I.P.U.C. No. 2031 filed on September 18, 2009. Written Order issued 11/4/09.
Consideration of Smart Grid Investments Pursuant to PURPA and EISA - Docket No. 4052 - Order No. 19766 to close the docket because the requirements of the EISA have or are being considered in other dockets. Written Order issued 9/22/09.
National Grid - Docket No. 4065 - Order No. 19711 granting in part the Division of Public Utilities and Carriers' June 9, 2009 Motion to Amend Schedule. Written Order issued 7/16/09. Errata Order No. 19722 to correct clerical error in Order No. 19711.
National Grid - Docket No. 4036 - Order No. 19674 issued to National Grid approving the Company's petition to exercise eminent the right of eminent domain - Cottrell. Written Order issued June 25, 2009.
National Grid - Docket No. 4041 - Order No. 19640 approving National Grid's April 9, 2009 proposed Accelerated 2010 Standard Offer Procurement Plan with modification. Written Order issued 5/7/09.
National Grid - Docket No. 4041 - Order No. 19610 issued to National Grid in Response to the Company's Moiton for Clarification of Order No. 19602. Written Order issued 4/6/09..
National Grid - Docket No. 4041 - Order No. 19602 rejecting National Grid's proposed Standard Offer Supply Procurement Plan and Renewable Energy Supply Procurement Plans. National Grid is directed to re-file the Procurement Plans. Written Order issued 3/18/09.
National Grid - Docket No. 4011 - Order No. 19623 approving a Standard Offer Service Rate of 9.2¢ per kWh, a Transmission Rate of 1.064¢ per kWh and a Transition Rate of 0.235¢ per kWh effective January 1, 2009. Written Order issued 4/20/09.
National Grid - Docket No. 3931 - Order No. 19621 approving National Grid's Least Cost Procurement Plan filed on September 2, 2009 consisting of the 2009-2011 Energy Procurement Plan and System Reliability Procurement Plan. Written Order issued 4/17/09.
Pascoag Electric Utility - Docket No. 3569 - Order No. 19612 granting Pascoag's request to waive credit card processing fee. Written Order issued 4/7/09.
National Grid - Docket No. 4000 - Order No. 19608 approving the Parties' Settlement Agreement regarding National Grid's Gas and Electric Energy Efficiency Program Plan for 2009. Written Order issued 4/6/09.
National Grid - Docket No. 3999 - Order No. 19590 issued to National Grid approving a revised Qualifying Facilities Power Purchase Rate effective January 1, 2009. Written Order issued 3/11/09.
Pascoag Utility District - Docket No. 4005 - Order No. 19584 issued to Pascoag approving Demand Side Management Programs and associated budget for 2009. Written Order issued 2/26/09.
Pascoag Utility District - Docket No. 4006 - Order No. 19583 issued to Pascoag Utility District approving a revised Standard Offer Charge, Transmission Charge and Transition Charge effective January 1, 2009. Written Order issued 2/26/09.
National Grid - Docket No. 4012 - Order No. 19580 approving National Grid's Renewable Energy Standard Procurement Plan and a RES charge of 0.093 per kWh effective 1/1/09. Written Order issued 2/25/09.
National Grid - Docket No. 3605 - Order No. 19572 approving National Grid's market assessment report to continue to procure LRS for the period April 2009 - December 2009 under the current LRS Acquisition Plan. Written Order issued 2/13/09.
Block Island Power Co. - Docket No. 3900 - Order No. 19504 approving new rates and authorizing BIPCo to collect additional revenues of $263,856 for a total cost of service of $2,607,548 effective June 1, 2008. Written Order issued 11/14/08.
National Grid - Docket No. 3969 - Order No. 19466 approving a Settlement Agreement between Narragansett Electric Co. d/b/a NGrid, Constellation and the Division of Public Utilities and Carriers filed on September 2, 2008
. Written Order issued 10/21/08.
National Grid - Docket No. 3960 - Order No. 19378 approving an increase to the Standard Offer Rate from 9.2¢ per kWh to 12.4¢ per kWh effective July 15, 2008 through December 31, 2008. Written Order issued 8/20/08.
National Grid - Docket No. 3605 - Order No. 19368 approving NGrid's proposal to procure Last Resort Service for period November 2008 through April 2009 in accordance with the Acquisition Plan. Written Order issued 8/8/08.
Pascoag Utility District - Docket No. 3896 - Order No. 19361 approving Pascoag's proposed realignment of the SO rate at $0.0594 per kWh, transition charge at $0.01662 per kWh and transmission charge at $0.02440 per kWh effective August 1, 2008. Written Order issued 8/6/08.
Proposed Standards for Energy Efficiency and Conservation Procurement & System Reliability - Docket No. 3931 - Report and Order No. 19344 issued to the RIEERMC's approving proposed standards for system reliability and energy efficiency and conservation procurement as amended. Written Order issued on July 17, 2008.
National Grid - Docket No. 3904 - Order Order No. 19274 approving National Grid's proposed new Standards for Connecting Distributed Generation, RIPUC No. 2007 and Qualifying Facilities Power Purchase Rate, RIPUC Tariff No. 1078-A. Written Order issued 4/22/08. Errata Order 19281 issued to National Grid to correct a mistake in Order No. 19274. Written Order issued 5/2/08.
RI Resource Recovery Corp. (RIRRC) - Docket No. 3565 - Order No. 19273 denying RIRRC's request for declaratory ruling for exemption from the definition of "public utility", "electric distribution company" or "distribution facility". Written Order issued 4/21/08.
National Grid - Docket No. 3901 - Order 19239 issued to National Grid approving Renewable Energy Standard (RES) procurement plan and RES charge of 0.084¢ effective 1/1/08. Written Order issued 3/7/08.
National Grid - Docket No. 3902 - Order No. 19202 issued to National Grid approving a Standard Offer Service rate of 9.2¢, Ttransmission Service Charge of $0.541¢ and Transition Charge of 0.322¢ per kWh. Also approving a credit of 1.306¢ to A-60 rate on first 450 kWh. The rates are approved effective 1/1/08. Written Order issued 2/2/08.
Rules Governing the Termination of Residential Electric, Gas and Water Utility Service - Docket No. 3876 - Order No. 19922 issued in response to the comments received and providing rationale for adopting or not adopting comments regarding the PUC's amendment to the termination rules. New amended termination rules were adopted for effect March 1, 2008. Written Order issued 3/5/08.
Pascoag Electric Co. - No. Order No. 19221 approving a revised Standard Offer Service Rate, Transmission Charge and Transition Charge effective 1/1/08. Written Order issued 3/5/08.
Pascoag Utility District - Docket No. 3888 - Report and Order No. 19180 approving Pascoag's 2008 DSM Programs with an overall budget of $116,000. Written Order issued 1/17/08.
National Grid - Docket No. 3892 - Report and Order No. 19179 approving a Settlement Agreement to provide National Grid an overall budget of $21,015,200 to implement Demand Side Management for 2008. ritten Order issued 1/17/08.
National Grid - Docket No. 3765 - Order No. 19801 approving National Grid's proposed Renewable Energy Standard ("RES") rate of 0.062 cents per kWh effective January 1, 2007, National Grid's RES Procurement Plan and directing the Company to file a proposed 2008 RES Procurment Plan by November 15, 2007. Order issued 10/17/07.
Pascoag Utility District - Docket No. 3776 - Order No. 19098 granting Pascoag's request to reallocate 2007 DSM funds. Order issued 10/12/07.
Block Island Power Co. - Docket No. D-07- 44 - Order No. 19095 approving BIPCO's request for consent and approval to obtain a loan. Order issued 10/10/07.
National Grid, Block Island Power and Pascoag Utility District - Docket Nos. 3804 and 3806 - Order No. 18055 granting utilities' Request for Relief from Order No. 18943 in connection with the Affordable Energy Plans. Order issued 8/31/07.
National Grid - Docket No. 3605 - Order No. 19050 approving NGrid's proposal to continue to procure Last Resort Service (LRS) power for residential and non-residential customers for the six-month period November 1, 2007 through April 30, 2008 in accordance with the LRS Acquisition Plan. Order issued 8/31/07. Errata Order No. 19061 issued 9/7/07.
Pascoag Utility District - Docket No. 3846 - Order No. 19032 approving Pascoag’s tariff advice to amend tariff entitled Large Commercial and Industrial Rate effective July 26, 2007. Order issued 8/10/07.
National Grid - Docket No. 3790 - Order No. 19024 approving the Company's Demand Side Management Programs and budget for years 2007 and 2008. Order issued 7/23/07.
National Grid - Docket No. 3628 - Order No. 19020 approving Amended Settlement of the National Grid and Division to modify benchmarks in Company's Service Quality Plan. Order issued 7/13/07.
Pascoag Utility District - Docket No. 3709 - Order No. 19005 approving Pascoag's request to re-align the standard offer, transition and transmission rates and to establish a Purchase Power Restricted Fund. Order issued 7/6/07.
National Grid, Block Island Power Co. and Pascoag Utility District - Docket Nos. 3804 and 3806 - Order No. 18973 approving Affordable Energy Plans for low-income household customers of National Grid, Block Island Power Co. and Pascoag Utility District. Order issued 5/31/07.
National Grid - Docket No. 3830 - Order No. 18956 approving National Grid's tariff advice filing to amend GreenUp Service Terms and Conditions, effective 11/12/07. Order issued 5/11/07.
The George Wiley Center - Docket No. 1725 - Order No. 18941 denying the Wiley Center's request for a two-week extension of the winter moratorium until May 1, 2007. Written Order issued 5/3/07.
Block Island Power Co. - Docket No. D-07-08 - Order No. 18936 approving BIPCO's petition to obtain a $600,000 secured loan from the RUS/FFB for the purpose of refinancing Engine No. 25. Written Order issued 4/26/07.
Pascoag Utility District - Docket No. 3569 - Order No. 18905 denying Pascoag's request for a waiver from the rules governing the acceptance of credit cards. Written Order issued 3/19/07.
Rules and Regulations Governing the Termination of Residential Electric, Gas and Water Service - Docket No. 3761 - Order No. 18887 on comments and rationale for amending the rules governing the termination of residential utility service to add a provision for "Summer Moratorium". Written Order issued 3/5/07.
National Grid - Docket No. 3605 - Order No. 18882 approving NGrid's proposal to continue to procure Last Resort Service (LRS) power for residential and non-residential customers for the six-month period May 1, 2007 through October 31, 2007 in accordance with the LRS Acquisition Plan. Written Orde issued 2/26/07.
National Grid - Docket No. 3788- Order No. 18878 approving revised rates for NGrid, effective 1/1/07 as follows: SO rate of 8.3˘ per kWh, transition rate of 0.559˘ per kWh; transmission adjustment factor of 0.474˘ per kWh; and further directing NGrid to return an additional $2 million of CTC Settlement Funds to the A-60 rate class through an additional per kWh reduction to the already reduced distribution charge on the first 450 kWh of use. Written Order issue 2/22/07.
National Grid - Docket No. 3779 - Order No. 18858 approving a Settlement Agreement (Appendix A attached to Order) providing National Grid with an overall budget of approximately $22,527,800 to implement Demand Side Management and services for 2007. Written Order issued 2/5/07
Pascoag Utility District - Docket No. 3776 - Order No. 18827 approving Pascoag Utility District's 2007 DSM Programs with an overall budget of $147,000. Written Order issued 1/11/07.
National Grid - Docket No. 3739 - Order No. 18794 approving a Standard Offer Rate of 9.4¢ for National Grid effective 9/1/06. Written Order issued 12/27/06.
National Grid - Docket No. 3771- Order No. 18787 denying National Grid’s request to change its designation of on-peak/off-peak hours; and ordering that the current tariff language remain in effect. Written issued 12/13/06.
National Grid - Docket No. 3716 - Order No. 18775 approving National Grid's updated and increased centerline foot costs for its line extension policies as submitted on March 1, 2006. Written Orde issued 11/17/06.
Pascoag Utility District - Docket No. 3763 - Order No. 18776 denying Pascoag's tariff filing to add language to limit the motor horsepower size to be installed under the Residential Rate A, and approved the rate with modified language as recommended by Division. Written Order issued 11/16/06.
Pascoag Utility District - Docket 3709 - Order No. 18723 approving Pascoag's revised rates for Standard Offer SO, Transmission and Transition effective August 1, 2006. Written Order issued 9/27/06
National Grid - Docket 3746 - Order No. 18714 approving National Grid's tariff advice filing to amend the Basic Residential Rate A-16. Written order issued 9/8/06.
Narragansett Electric Co. d/b/a National Grid - Docket No. 3605 - Order No. 18699 approving Narragansett Electric's procurement of Last Resort Service for period November 1, 2006 - April 30, 2007. Written Order issued 8/23/06.
Narragansett Electric Co. d/b/a National Grid - Docket No. 3732 - Order No. 18698 recommending to the Energy Facility Siting Board that there is a need to construct the Narragansett Electric's proposed Southern Transmission Project and its cost is reasonable and justified. Written Order issued 8/23/06.
Narragansett Electric Co. d/b/a National Grid and Southern Union Co. (New England Gas Co.) - Docket No. D-06-13 - Report and Order No. 18676 approving the purchase by the Narragansett Electric Company of the assets associated with the regulated gas distribution business owned and operated by Southern Union Company in Rhode Island as the New Gas Company. Written Order issued 7/25/06.
Narragansett Electric Co. d/b/a National Grid and Southern Union Co. (New England Gas Co.) - Docket No. D-06-13 - Order No. 18659 denying the Attorney General's Motion to Compel Southern Union to Answer Third Set of Data Requests. Written Order issued 6/30/06.
Narragansett Electric Co. d/b/a National Grid and Southern Union Co. (New England Gas Co.) - Docket No. D-06-13 - Order No. 18657 denying the Attorney General's Motion to Compel Southern Union Document Production & Request for Preliminary Examination. Written Order issued 6 /27/06.
Narragansett Electric Co. d/b/a National Grid and Southern Union Co. (New Engand Gas Co.) - Docket No. D-06-13 - Order No. 18641 in response to the several motions to compel the utilities to respond to data requests. Written Order issued 6/16/06.
Narragansett Electric Co. d/b/a National Grid and Southern Union Co. (New England Gas Co. ) - Docket No. D-06-13 - Order No. 18626 denying the City of East Providence's Motion for Stay and Request for an Emergency Hearing. Written Order issued 6/1/06.
Narragansett Electric Co. d/b/a National Grid and Southern Union (New England Gas Co.) - Docket D-06-13 - Order No. 18620 granting the Attorney General's request for extension of deadline on discovery Written order issued 5/26/06.
Narragansett Electric Co. d/b/a National Grid and Southern Union (New England Gas Co.) - Docket D-06-13 - Order No. 18591 in response to the various motions to intervenve filed by the parties concerning the proposed acquisiton or merger by the companies. Written order issued 5/4/06.
Block Island Power Co. - Docket No. 3655 - Order No. Order No. 18570 rejecting the Town of New Shoreham's Motion for Summary Rejection of BIPCo's Management Compensation Compliance Filing and accepting BIPCO's compliance filing on management compensation. Order issued 4/17/06.
Narragansett Electric Co. d/b/a National Grid - Docket No. 3716 - Order No. 18536 approving National Grid's proposed revision to Line Extension Policies effective February 1, 2006. Order issued 2/27/06.
Narragansett Electric Co. d/b/a National Grid - Docket No. 3701 - Report & Order No. 18516 approving a Settlement of the Parties addressing National Grid's Demand Side Management Programs and budget for 2006 with modification. Order issued 1/26/06.
National Grid - Docket No. 3710 - Report and Order No. 18510 authorizing National Grid to dispense $16.5 million of settlement proceeds as follows: 1) to allocate $8.5 million of the settlement proceeds to ratepayers through the Transition Charge over one year; and 2) to allocate $2 million (of the $8 million proposed for a low income discount program) to be applied to the first 450 kWh of usage per month for customers taking service under the low income Rate A-60 for one year; and 3) dispensation of the remaining $6 million is held in abeyance for future action. Order issued 1/24/06.
National Grid - Docket No. 3706 - Report and Order No. 18509 approving revised rates for National Grid. Approving a Standard Offer rate of 10.0˘ per kWh; Transition Charge of 0.575˘ per kWh; and Transmission Adjustment Factor of 0.371˘ per kWh effective 1/1/06. Order issued 1/24/06.
Pascoag Utility District - Docket No. 3709 - Report and Order No. 18508 approving revised rates for Pascoag Utility District. Approving a Standard Offer rate of $0.07206 per kWh; Transition Charge of $0.0119 per kWh; and Transmission Charge of $0.01005 per kWh effective 1/1/06. Order issued 1/23/06.
Pascoag Utility District - Docket No. 3700 - Report and Order No. 18507 approving Pascoag's 2006 Demand Side Management programs & budget. Order issued 1/23/06.
Narragansett Electric Co. d/b/a National Grid - Docket 3605 - Order 18495 approving National Grid's procurement of Last Resort Service for period March 1 - October 31, 2006, and approving the Company's Contingency Plan filed on 11/1/05. Order issued 1/11/06.
Implementation of a Renewable Energy Standard (RES) Rulemaking - Docket No. 3659 - Final Report (Order No. 18485) regarding comments received on proposed RES rules - Order issued 12/28/05.
Narragansett Electric Co. d/b/a National Grid - Docket 3689 - Order No. 18473 approving Company's proposed increase to the Standard Offer Service Rate to 8.2¢ per kWh effective October 1, 2005. Written order issued 12/14/05.
Narragansett Electric Co. d/b/a National Grid - Docket 3617 - Order No. approving Company's request for extension of the Customer Credit until 12/31/05. Written order issued 11/18/05.
Block Island Power Co. - Docket 3655 - Errata Order No. 18500 issued to Block Island Power to correct Report and Order 18364. Order issued 1/17/06.
Pascoag Utility District - Docket No. 3685 - Order No. 18352 approving Pascoag's filing to amend its Large Commercial and Industrial Demand Charge. Written order issued 9/1/05.
Block Island Power Co. - Docket 3655 - Order No. 18364 authorizing Block Island Power to collect additional revenues of $219,047 for a total rate year base revenue requirement of $2,328,304 and approving new rates effective June 1, 2005. Written order issued 9/13/05.
Narragansett Electric Co. c/b/a National Grid - Docket 3680 - Order No. 18267 approving Narragansett's proposed 2005 Summer Load Curtailment Program. Written Order issued 6/6/05.
Narragansett Electric Co. d/b/a National Grid - Docket 3679 - Order No. 18363 approving Company's tariff advice filing to amend Terms & Conditions for Non-regulated Power Producers to permit electronic exchange between Narragansett and suppliers. Written order issued 9/12/05.
Narragansett Electric Co. d/b/a National Grid - Docket 3678 - Order No. 18266 approving Narragansett's proposed amendment to R.I.P.U.C. Nos. 1192 and 1193, Terms and Conditions to allow for Off Cycle Meter Reads and other minor changes. Written order issued 6/6/05.
Pascog Utility District - Docket 3657 - Order No. 18312 approving tariff advice request to change Pascoag's request to change the reconciliation filing requirements for SO, transmission and transition from semi-annual to annual reconciliation (7/29/05)
Pascoag Utility District - Docket 3657 - Order 18306 approving request to keep current Standard Offer Service Rate, Transmission Charge and Transition Charge in effect through January 31, 2006. Ordier issued 7/21/05.
Narragansett Electric Co. - Docket 3628 - Order 18294 approving a Settlement Agreement to incorporate a new Service Quality Plan for effect January 1, 2005. Order issued 7/12/05.
Narragansett Electric Co. - Docket 3605 - Order 18250 approving Narragansett's proposal to continue to procure Last Resort Service under the terms of the approved Acquisition Plan; and to procure power for residential and non-residential customers for the six-month period, September 1, 2005 through February 28, 2006, with the option for additional procurements for residential customers in accordance with the terms of the Acquisition Plan. Order issued 5/24/05.
Pascoag Utility District - Docket 3474 - Order 18249 approving Pascoag's request to allocate Demand Side Management programs funds. Order issued 5/24/05.
Energy Source Disclosure Rulemaking - Docket 3642 - Commission Report on Final Rules. Order issued 3/1/05.
Block Island Power Co. - Docket 3655 - Order 18157 denying the Block Island Sustainability Coalition (BISC) Motion to Intervene. Order issued 2/18/05.
Narragansett Electric Co. - Docket 3635 - Order 18152 approving 2005 Demand Side Management Programs and budget. Order issued 2/17/05.
Narragansett Electric Co. - Docket 3648 - Order 18151approving (maintain at current level) Standard Offer rate at 6.7 cents kWh and (decrease) Transition Charge at 0.845 cents effective January 1, 2005. Order issued 2/17/05.
Pascoag Utility District - Docket No. 3657 - Order 18153 approving a Standard Offer rate at 5.482¢ per kWh, a Transition Charge at 0.234¢ per kWh and a Transmission Charge at 1.043¢ per kWh effective February 1, 2005. Order issued 2/17/05.
Scott Pollard Complaint Against Narragansett Electric Co. - Docket 3643 - Order 18101 in response to compliant regarding Line Extension Policy. Order issued 12/22/04.
Narragansett Electric Co. - Docket 3617 - Order No. 18037 approving Second Amended Stipulation and Settlement between Narragansett Electric, Divison of Public Utilities, Dept. of Attorney General, The Energy Council of RI, the US Dept. of Navy and People's Power & Light. The Settlement resolves issues associatd with Narragansett's distribution rates and rate design during the period October 28, 2004 through December 31, 2009. Order issued November 9, 2004.
Narragansett Electric Co. - Docket 3571 - Order 17972 approving a Standard Offer Service of 6.7 cent per kWh effective August 1, 2004. Order issued August 26, 2004.
Narragansett Electric Co. - Docket D-04-16 - Order 17957 granting Narragansett's request to initiate a rulemaking procedure to modify existing Rules Prescribing Standards for Electric Utilities and approving new regulations. Order issued August 18, 2004.
Pascoag Utility District - Docket 3580- Order 17931 dismissing Standard Offer, transmission and transition tariff filing. Order issued July 29, 2004.
Narragansett Electric Co. - Docket 3463 - Order 17927 approving Company's 2004 Demand Side Management Programs and budget. Order issued July 28, 2004.
Miles Avenue Property LLC Complaint Against Narragansett Electric Co. - Docket D-03-10 - Order 17818 Order denying Miles Ave. Property's complaint that Narragansett refused to provide overhead electric service to property owned. Order issued July 14, 2004.
Narragansett Electric Co.- Docket 3605- Order 17903 approving Last Resort Service Acquisition Plan for period September 1, 2004 - February 28, 2005 and optional periods for residential customers. Order issused July 12, 2004.
Narragansett Electric Co. - Docket 3608 - Order 17902 approving proposed 2004 Summer Load Relief Program. Order issued July 8, 2004.
Pascoag Utility District - Docket 3474 - Order 17901 approving request to re-allocated Demand Side Management (DSM) funds. Order issued July 8, 2004.
Pascoag Utility District - Dockets 3546 & 3580 - Order 17820 approving Settlement Agreement to provide additional revenues of $163,039 or 10.1% over present rate revenues and new rate design. Also, approving a Standard Offer Service charge of $0.05167 per kWh, transition rate of $0.00701 per kWh and transmission rate of $0.00937 per kWh effective February 1, 2004. Order issued May 5, 2004.
Rules & Regulations Governing the Termination of Gas and Electric Service - Docket 1725 - Order 17805 denying the George Wiley Center request for extension of the winter moratorium from April 15 to April 20. Order issued April 16, 2004.
Narragansett Electric Co. - Dkt. 3571 - Order No. 17800 approving a Standard Offer Service rate of 5.9 cents per kWh, transition rate of .855 cents per kWh and transmission rate of .478 cents per kWh for effect 01/01/04. Order issued March 31, 2004.
Narragansett Electric Co. Dkt. 3534 - Order No. 17753 approving Narragansett's GreenUp Program designed to introduce new opportunities for Standard Offer Service & Last Resort Service customers to voluntariliy support the growth of renewable energy resources and to expand the number of retail suppliers offering renewable energy alternatives. Order issued February 16, 2004.
Narragansett Electric Co. Dkt. 3515 - Order No. 17752 approving Narragansett's request to continue Last Resort Acquisition Plan for purposes of procuring power for non-residential customers for period March 1, 2004 - August 31, 2004. Order issued February 16, 2004.
Narragansett Electric Co. Dkt. 3564 - Order No. 17690 Advisory Opinion to the Energy Facility Siting Board Regarding the Need, Cost and Safety of Narragansett Electric Companyís Proposal to Relocate Transmission Lines Between the Cities of Providence and East Providence Which Application is Pending Before the EFSB. Opinion issued 01/27/04.
Narragansett Electric Co. Dkt. 3551 - Order No. 17644 approving a settlement agreement entered between Narragansett Electric and the Dept. of Navy to place the Newport Naval Station on Narragansett Electric Rate G-62 effective January 1, 2004. Order issued December 23, 2003.
Pascoag Utility District - Dkt. 3474 - Report & Order No. 17642 approving 2004 Demand Side Management Programs and budget. Order issued 12/22/03.
Rules & Regulations Governing the Termination of Gas and Electric Service - Dkt. 1725 - Order No. 17617 Order denying the George Wiley Center's Petition for Emergency Relief to temporarily adopt changes to the existing regulation, specifically, modify the rule requiring a 25% down payment on arrearages and permit a lower down payment for the restoration of service. Order issued November 21, 2003.
Narragansett Electric Co. Dkt. 3496 - Order No. 17592 approving Narragansett's request to recover cost associated with an amendment to its Standard Offer Supply Contract. Order issued October 28, 2003.
Pascoag Utility District - Dkt. 2861 - Report & Order No. 17553 approving Standard Offer Service charge of $0.05619 per kWh, transition rate of $0.01345 per kWh and transmission rate of $0.00453 per kWh for effect 07/09/03. Order issued September 4, 2003
Narragansett Electric Co. Dkt. 3515 - Order No. 17532 approving Last Resort Acquisition Plan covering the six-month period, Sept. 1, 2003 - Feb. 28, 2004; and optional second period Mar1, 2004 - Aug 31, 2004. Order issued August 6, 2003.
Narragansett Electric Co. (DSM) Dkt. 3463 - Order No. 17516 approving a Settlement Agreement executed by Narragansett Electric, Division of Public Utilities, The Energy Council of RI, The State Energy Office and the Coalition for Consumer Justice concerning Narragansett Electric Demand Side Management calendar 2003. Order issued July 21, 2003.
Narragansett Electric Co. - Dkt. 3508 - Order No. 17495 approving a Standard Offer Service rate 5.5 cents per kWh for effect 06/01/03. Order issued June 20, 2003.
Pascoag Utility District - Dkt. 3474 - Report & Order No. 17464 approving request for reallocation of DSM funds. Order issued May 21, 2003
Pascoag Utility District - Dkt. 2861 - Report & Order No. 17436 approving Standard Offer Service rate of $0.03431 per kWh, transition rate of $0.01892 per kWh and transmission rate of $0.00701 per kWh for effect 02/06/03. Order issued April 22, 2003.
Narragansett Electric Co. - Dkt. 3479 - Order No. 17424 approving a Standard Offer Service rate of 4.662 cents per kWh, transition rate of .944 cents per kWh and transmission rate of .063 cents per kWh for effect 01/01/03. Order issued April 11, 2003.
Narragansett Electric Co. - Dkt. 2930 - Order No. 17354 approving the Company's request to apply property tax saving to the Environmental Response Fund. Order issued 01/29/03.
Narragansett Electric Co. - Dkt. 3444 - Report & Order No. 17355 directing the Company to eliminate the 4.5 cents per kWh rate floor for non-residential Last Resort Service customers. Order issued 01/29/03.
Narragansett Electric Co. - Dkt. 3444 - Report & Order No. 17203 approving Last Resort Service Acquisition Plan. Order issued 10/22/02.
Pascoag Utility District - Dkt. 3474 - Report & Order No. 17346 approving 2003 Demand Side Management Programs and budget. Order issued 01/23/03.
Pascoag Utility District - Dkt. 2510 - Report & Order No. 17104 approving 2002 Demand Side Management Programs and budget. Order issued 08/20/02.
Narragansett Electric Co. - Dkt. 3240 - Report & Order No. 17106 approving 2002 Demand Side Management Programs and budget. Order issued 08/20/02.
Narragansett Electric Co. Petition for Declaratory Judgment Regarding Station Service Delivery Charges Assessed to USGen New England, Inc. - Docket No. 3342 - Order 17108 approving 1) Settlement and Stipulation between Narragansett and USGen and 2) resolving station service delivery charges and 3) the creation of a new Station Power Delivery and Reliability Service Rate M-1. Order issued 08/20/02.
Pascoag Utility District - Dkt. 2861 - Order No. 17120 approving Standard Offer Charge of $0.04514 per kWh, Transmission Charge of $0.00487 per kWh and Transition Charge of $0.00641 per kWh effective August 1, 2002 . Order issued 09/05/02.
Request to Amend Rules & Regulations Governing the Termination of Residential Electric, Gas, and Water Utility- Docket 3426 - Order 16966 approving amendments to current regulations. Order issued April 16, 2002.
Pascoag Utility District - Dkt. 2681 - Order No. 17055 approving Standard Offer Charge of $0.04602 per kWh, Transmission Charge of $0.00687 per kWh and Transition Charge of $0.01722 per kWh effective for bills rendered on or after February 1, 2002 . Order issued 07/11/02.
Narragansett Electric Co. - Dkt. 3005 - Order No. 16920 approving Last Resort Service rate for periods May 2001 - August 2001, and September 2001 - August 2002. Errata Order No. 16929.
Narragansett Electric Co. - Dkt. 3402 - Order No. 16916 approving rate reductions to Standard Offer Rate, Transition Charge and Transmission Adjustment Factor for effect January 1, 2002.
Pascoag Utility District - Dkt. 2861 - Order No. 16832 approving revised Standard Offer Service rate, transmission and transition charge for period 11/01/01 - 01/31/02.
Narragansett Electric Co. - Dkt. 3240 - Order No. 16903 granting the Company an extension to file proposed 2002 DSM and renewables energy programs, and authorizing the continuation of the current 2001 DSM and renewable energy programs. Order issued on 01/30/02.
Narragansett Electric Co. - Dkt. 3240 - Order No.16798 approving a Stipulation to implement Demand Side Management and renewable energy programs and approve budget for year 2001. Issued 11/29/01.
Narragansett Electric Co. - Dkt. 2867 -Order No. 16752 approving a Stipulation and Settlement Agreement to implement a High Voltage Service Rate H-72, High Voltage Back-Up Service Rate B-72 and Electric Propulsion Rate X1, issued on 10/26/01.
Pascoag Utility District - Dkt. 2510 - Order No. 16724 approving Demand Side Management budget and programs for 2001. Issued 09/24/01.
Narragansett Electric Co. - Dkt. 3379 - Order No. 16731 approving a reduction to the Standard Offer Service Rate effective October 1, 2001. Issued 10/02/01.
Pascoag Utility District - Dkt. 2681 - Order No.16689 approving a request to maintain the currents Standard Offer Service rate, transmission and transition charges in effect.. Issued 08/21/01.
Narragansett Electric Co. - Dkt. 3287 Order No. 16651 approving Standard Offer Service Rate and other adjustments effective April 1, 2001. Order issued 06/10/01.
Narragansett Electric Co. - Dkt. 3005 Order No.16638 approving the Selection of the Last Resort Service Supplier for period November 2000 - April 2001. Issued 06/14/01.
Narragansett Electric Co. - Dkt. 3243 Order No. 16636 approving Standard Offer Service Rate, transition charge and transmission adjustment factor effective 01/01/01 (through 03/31/01). Errata Order 16931.
Narragansett Electric Co. - Dkt. 3138 Order No. 16635 approving Standard Offer Service Rate and Standard Offer Adjustment Factor for period September 1, 2000 - December 31, 2000. Issued 06/13/01.
Pascoag Fire District - Dkt. 2861 Order No. 16637 approving Standard Offer Service rate, transmission and transition charges effective 02/01/01. Issued 06/14/01.
US Dept. of Navy Petition for Declaratory Judgment - Dkt. 3132 Order denying the Navy's petition declaring that it is entitled to be placed on Narragansett Electric Company's rate schedule G-62 instead of the new N-01 rate approved by the Commission as a result of the merger settlement in Dkt. 2930. Order No. 16437 issued 10/30/00.
Pascoag Fire District - Dkt. 2861 Order approving request for waiver of the six-month reconciliation of the Standard Offer Charge, Transmission Charge and Transition Charge and request to continue the existing charges through January 31, 2001. Order No. 16392 issued 09/22/00.
Indeck-North Smithfield LLC - Dkt. 3094 Need Assessment Advisory Opinion to Energy Facility Siting Board regarding Indeck-North Smithfield's proposal to construct a power production facility. Order No. 16388 issued 09/06/00.
Block Island Power Co. - Dkt. 1998 Order authorizing BIPCO to continue the collection of the environmental remediation surcharge at $0.00729 per kWh through April 30, 2001. Order No. 16365 issued 08/28/00.
Block Island Power Co. - Dkt. 1980 Order authorizing BIPCO to recover urea and fuel through the Fuel Adjustment Clause. Order No. 16366 issued on 08/28/00.
Narragansett Electric Co. - Dkt. 3138 Order No. 16305 approving Standard Offer Service rate or 4.1˘ per kWh effective July 1, 2000 issued on 06/30/00.
Narragansett Electric Co. - Dkts. 3117 & 3005 (Last Resort Service Rate) Final Report & Order approving LRS rate for non-residential customers and Company's selection of the Last Resort Service power supplier. Order No. 16281 issued June 16, 2000.
Narragansett Electric Co. - Dkt. 3117 (Last Resort Service Rate) Order approving LRS rate for the period June 1 - August 31, 2000. Order No. 16279 issued 06/02/00.
Narragansett Electric Co. - Dkt. 3031 (Transmission Adjustment Factor) Order approving a revised Transmission Adjustment Factor of $0.00238 per kWh effective June 1, 2000. Order No. 16275 issued 06/01/00.
Pascoag Fire District - Dkt. 2510 Order approving Demand Side Management budget and programs for year 2000. Order No. 16268 issued 05/25/00.
Block Island Power Co. - Dkt. D-00-10 Order authorizing debt in the amount of $3,420,000 with the Rural Utilities Service/Federal Financing Bank. Order No. 16267 issued 05/23/00.
Pascoag Fire District - Dkt. 2861 (Standard Offer) Order approving revised Standard Offer Charge of $0.03384 per kWh, Transmission Charge of $0.00517 per kWh and Transition Charge of $0.02353 per kWh effective 02/01/00. Order No. 16246 issued 05/11/00.
Narragansett Electric Co. - Dkt. 1939 (DSM) Order approving the application of Brown University for a rebate to participate in the Company's Design 2000 Programs. Order No. 16218 issued 05/04/00.
Narragansett Electric Co. - Dkt. 3024 Order approving amendment to the Terms and Conditions for Nonregulated Power Producers. Order No. 16209 issued 04/07/00.
DownCity Energy Co. LLC - Dkt. 3091 Petition for declaratory ruling that the provisions of the Consumer Protection Requirements for Nonregulated Power Producers Sections II D(3) and II H (regarding the shutoff of service to customers) does not apply to the relationship between DownCity and its customers. Order No. 16208 issued 04/07/00.
Narragansett Electric Co., Blackstone Valley Electric Co. & Newport Electric Corp. Consolidation and Adjustment of Rate Relating to Merger - Dkt. 2930 - Order No. 16200 approving Stipulation and Settlement . Issued 03/24/00.
Narragansett Electric Co., Blackstone Valley Electric Co. & Newport Electric Corp. Petition to Approve Merger - Dkt. D-99-12 Order No. 16186 approving merger, issued 02/25/00.
|