Distributed Generation Interconnection Reporting Requirements

At an Open Meeting on October 11, 2019, the RI Public Utilities Commission (PUC) adopted the reporting requirements set forth in the Interim Guidance – Affected System Operator Studies issued by the Massachusetts Department of Public Utilities. The Interim Guidance can be found at: https://fileservice.eea.comacloud.net/FileService.Api/file/FileRoom/11239621. The Interim Guidance is adopted with modifications applicable to The Narragansett Electric Co. d/b/a National Grid.